top of page

CONSTRUCTION EQUIPMENTS
Suntech provides design services for wide variety of Construction Equipments

OVERHEAD LAUNCHING GIRDER-GROUND FEEDING
PRECAST SEGMENTAL CONSTRUCTION OF PSC BOX GIRDER SUPERSTRUCTURE-BOX SEGMENTS LIFTED FROM UNDER THE LAUNCHING GIRDER

OVERHEAD LAUNCHING GIRDER-REAR FEEDING
PRECAST SEGMENTAL CONSTRUCTION OF PSC BOX GIRDER SUPERSTRUCTURE-BOX SEGMENTS SUPPLIED FROM BEHIND THE LAUNCHING GIRDER

LAUNCHING GIRDER
PSC ‘I’ GIRDER LAUNCHING AND ERECTION FOR BRIDGES ACROSS INACCESSIBLE PLACES

UNDERSLUNG LAUNCHING GIRDER
PRECAST SEGMENTAL CONSTRUCTION OF PSC BOX GIRDER SUPERSTRUCTURE-BOX SEGMENTS SUPPLIED FROM REAR, SPAN ERECTED OVER THE LAUNCHING GIRDER.

FORM TRAVELER
CASTING OF CAST-IN-SITU BALANCED CANTILEVER SUPERSTRUCTURE

SEGMENT ERECTION GANTRY
CONSTRUCTION OF EXTRA-DOSED / CABLE STAY BRIDGE SUPERSTRUCTURE

FLOATING GANTRY
USED FOR ERECTION PRECAST PSC GIRDERS OF BRIDGES ACROSS RESERVIORS, CREEKS OR ANY OTHER WATER BODIES.

GOLIATH GANTRY
HANDLING OF HEAVY LOADS LIKE PRECAST SEGMENTS (UPTO 150 MT), REINFORCEMENT CAGE AND SHUTTERING PANELS IN CASTING YARD, RAIL YARDS AND OTHER OUTDOOR AND INDOOR YARDS.

JACK UP PONTOON
SELF-ELEVATING PLATFORMS USED TO CARRY DREDGING EQUIPMENTS, CRANES AND INSTALLATION OF PILE RIGS

FLOATING PONTOON
FLOATING PLATFORMS USED FOR INSTALLATION OF CRANES, TRANSIT MIXER, WINCH, CONVENTIONAL PILING TRIPOD/TOWER AND SIMILAR OTHER EQUIPMENTS.

DECK ERECTION CRANE
USED FOR CONSTRUCTION OF SEGMENTAL COMPOSITE CABLE STAY BRIDGES
bottom of page